Brief Introduction of Quality System Management
Quality is the life for an enterprise. Since the found
of our factory,we always enforce the management and improvement
on products'quality .Through process amnagement in the factory,we
have already established a set of effective and specific quality
man-agement system,and got the admission to ISO9001 quality system.
In the process of manufacture ,we seriously comtrol 3 points as
below:
The first is the controlling of materials and purchasing parts form
suppliers.All materials should be delivery to the warehouse only
after attached with the suppliers'Quality Appoval Sheet and by the
IQC approval through sample inspection .Then paint mark and keep
the assorted materials ;before issue them to the shop and machined
,materials must double-checked by the QA and be attached with material
flow card Quality System Team must audit the suppliers that provide
materials until they become app-roval suppliers.the materials also
are inspected by sample or totally according to the related standard
or technology documents before they are delivered to warehouse .
Secondly,we strctly control the quality of semifinished products(product
parts).All the operators must stmctly carry out 3 points (the standards,drawings,and
techniques).The Quality Assurance inspects the quality of every
procedure fully individually and strictly.The abnormal parts will
not allowed to the following procedure.The serni-finished products
must be inspected totally and material certificated through spectroscopy
before go to semi-finished warehouse.Two-head solenoid and some
parts of valve made by alloy-steel solenoid muat crry out the magetism
particles destruction experiment,the airproof cover must carry out
stain dextruction experiment, safe-valve must carry out ultrasonic
destruction experimetnt,the weld of big caliber valves must carry
out ray destruction experiment,and so on.
Thirdly ,we control the products,qua-lictiy.strictly.Parts made
by alloy-steel need be double checken up with material analysis
through spectroscopy.The products must be inspected through assenbly
test and property experiment accrding to related standard technology
documents.
We sufficiently use computer to tail after,statistic,analyze,feedbacd,and
manage all the quality in the process.For example,using computer
to select the better materials to assemble and the assembly shop
work according to the computers'instru-ction.The application of
using computer to assistant product quality management system stabilizes
and improves the product quality.This system got the admission to
National Mechanical Department and Electrical Power Department and
got simultnaeousy Technology Advance Award in JiangSu Province in
the bottom of 1991,In order to provide quality data in time and
accurately,we set up a set of integrate quality archives.So pick
up and any valves'NO of leeving factory,you can promptly index all
the primary quality records of the valve in process.In 1990 On the
quality conference of National Boiler Guild held by the National
Mechanical Department our quality management system mode (establish
documents machine by machine)was highly appraised and popularized
to other Valve Trade.
In a word,our factory organizes the producing strictly according
to the demand of ISO9001 quality system and carry out in every working
procedure,which efficiently assure the products'quality.Our company
gained"quality management award"of JiangSu province and
NanTong City.
|
|